Guidance on corrective action and preventive action and related QMS processes GHTF/SG3/N18:2010

Identify Root Cause ? The output of the root cause analy-sis should be a clear statement of the most fundamental cause(s) re-sulting in the nonconformity Specify: ? What the action is ? Who will do it ? When it should be done It has been concluded that the root cause of the tubing sur-face finish issue is inadequate line clearance procedures established at the supplier. Planned actions Verification of actions Verification of effective-ness Corrective action: Supplier to add line clearance require-ments to documented procedures by [date]. Preventive action: Not applicable. ? Verification activities are to ensure General examples are included below. Actual documenta-that all the elements of the pro-tion would need to be more specific. posed action (documentation, ? Review and approval of the procedural changes prior training etc) will satisfy the re-to use quirements of the proposed action ? Conduct a pilot of new procedure on a specific project/department/time frame prior to full scale im-? Validation activities generate data plementation and information that confirm the ? Verification that the updated supplier procedure ad-likelihood of the effectiveness of dresses the process that caused the nonconformity the corrective action to eliminate ? Verification that the training materials address the the nonconformity or proposed specific process that caused the nonconformity nonconformity. ? Comparing a new design specification with a similar proven design specification ? Performing calculations using an alternative method ? Perform validation of equipment, software, production processes, test method, component, etc. Specific example: Review and approval of supplier procedure XXX by the supplier and the customer to ensure adequacy of the up-dated line clearance process. Method or data for the determination of X months after implementation: effectiveness with acceptance criteria. ? The improvement goal ? Conduct a query of the electronic manufacturing data ? The evidence (data sources) that system to verify there are zero surface finish rejects will be used to support effective-for this component at finished Product A final inspec-ness (e.g., a data source could be tion. where the problem was initially found) ? Supplier Quality Engineer to conduct on site review at ? The time frame that effectiveness the supplier of the action to confirm the procedures will be monitored (e.g., upon com-are in place, are known to the operators, and there is pletion of actions or three months, evidence that the procedures are being followed. six months as appropriate) OR ? Sample size required to demon-strate effectiveness Winterhufen 1.0 November 4, 2010 Page 26 of 26

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说教育文库医疗器械CAPA指南 质量管理体系(6)在线全文阅读。

医疗器械CAPA指南 质量管理体系(6).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/jiaoyu/676794.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: