spice规范V4.5
Table 2 — Primary Life Cycle Processes – SPL process group Process
Identification
SPL.1
SPL.2 PRM Process name Supplier tendering Product release Source ISO/IEC 12207 Amd.2 (§F1.2.1) ISO/IEC 12207 Amd.2 (§F1.2.3)
The Engineering process group (ENG) consists of processes that directly elicit and manage the customer's requirements, specify, implement, or maintain the software product, its relation to the system.
Table 3 — Primary Life Cycle Processes – ENG process group Process
Identification
ENG.1
ENG.2
ENG.3
ENG.4
ENG.5
ENG.6
ENG.7
ENG.8
ENG.9
ENG.10 PRM Process name Requirement elicitation System requirements analysis System architectural design Software requirements analysis Software design Software construction Software integration test Software testing System integration test System testing Source ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.1) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.2) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.3) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.4) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.5) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.6) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.7) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.8) ISO/IEC 12207 Amd.1 (Annex F; §F.1.3.9) ISO/IEC 12207 Amd.1 (Annex F;
§F.1.3.10)
百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说教育文库automotiveSIG_PRM_v45(13)在线全文阅读。
相关推荐: