b) Ensure all costs are properly allocated against project codes

c) Ensure all costs are genuinely in pursuit of project activities

d) Check that other projects are not using the budget.

Then, managers should monitor and control change to the project budget. It means the following things:

a) Concerned with key factors that cause changes to the budget

b) Controlling actual cost changes as they occur

- Monitor cost performance to detect variances

- Record all appropriate changes accurately in the cost baseline

- Preventing incorrect, unauthorized changes being included in the cost baseline

- Determine positive and negative variances

- Integrated with all other control processes (scope, change, schedule, quality)

As a project is dynamic, sometimes the project managers know the project is going out off target by monitoring, but don't know the best action to take. In this circumstance, net present value (NPV) should be used as an ongoing monitor and control mechanism, because NPV takes account of the time element and discounts future cash flows, it is the result of the time effect on cash

4.3 Change monitor and control

Voropajev (1998) states that dynamic changes of project environment will influence the process of project implementation, the project itself and may cause heightened risk. When carried out some activities, the methods different from that in the original plan must be used to keep the process moving forward (as experienced under practice). Therefore, changes are inevitable and need to be managed during project life-cycle (Voropajev. 1998,p 16- 17) .An effective change control system should be established to ensure change procedure is clear and unambiguous and easy for employee to request a change. And the following things need to be concerned:

a) Monitoring and forecasting most probable changes Key factors that generate change to ensure good results; make sure that change must be checked by suitable person.

b) Changes should take place once it is approved and be monitored to check whether it worked as expected

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说教育文库成本管理外文文献翻译(3)在线全文阅读。

成本管理外文文献翻译(3).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/jiaoyu/1183652.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: