77范文网 - 专业文章范例文档资料分享平台

风险管理文献综述 2(3)

来源:网络收集 时间:2020-04-16 下载这篇文档 手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:或QQ: 处理(尽可能给您提供完整文档),感谢您的支持与谅解。点击这里给我发消息

11

Range Planning,2003,36:337-353.

[13]Patrick

T.I.Lam.Asartorial

review

of

risks

associated

with

major

infrastructure

Projects.International Journal of Project Management,1999,17:77-87.

[14]Darrin Grimsey,Mervyn K.Lewis.Evaluating the risks of public-private partnerships for infrastructure projects.International Journal of Project Management,2002,20:107-118.

[15]A.Ucbechukwu.Elinwa and Silas A.Buba Construction cost factors in Nigeria[J].Journal of construction engineering and Management,Vol.119No.4.1993:698-713.

[16]L.Y.Shen project risks Management in Hong Kong Intemational[J].Journal of project Management,Vol.15 No.5.1997:101-105.

[17]Arndt RH.Risk Allocation in the Melbourne City Link Pro-ject[J].Project Finance,1998,4:11-24. [18]Li B.Risk Management of Public/Private Partnership Pro-jects.Un-published PhD Thesis[M].School

of

the

Builtand

Natural

Environment.Glasgow

Caledonian

University.Glasgow,Scotland.2003.

[19]Li

Bing,A.Akintoye,Peter

J.Edwards,and

C.Hardcastle,The

allocation

of

risk

in

PPP/PFIConstruction projects in the UK,in International Journal of Project Management.2005,Elsevier Ltd,Oxford,OX5 1GB,United Kingdom.

[20]Li-Yin Shen,Andrew Platten,X.P.Deng Role of public private partnerships to manage risks in publicsector projectsin Hong Kong[J].International Journal of Project Manage-ment 24(2006):587-594.

[21]Martinus P.Abednego,Stephen O.Ogunlana Goodproject governance for proper risk allocation in public pri-vate partnerships in Indonesial[J]International Journal of Project Management 24(2006)622-634.

[22]Loosemore

M,Raftery

J,Reilly

C,Higgon

D.Risk

management

in

projects[J].London:Taylor&Francis,2006.

[23]Grimsey D,Lewis KK.Public private partnerships[J].Chelt-man,UK:Edward Elgar;2004. [24]Zhang

X

Q.Kumaraswamy

M.Procurement

protocols

for

public-private

parterner

projects[J].Journal of Construction Engineering and Management,2001,126(3):172.

[25]Zhang X Q,Kumara swamy M M Zheng W Concessionaire selection for Build Operate-Transfer tunnel projects in Hong Kong[J].Journal of Construction Engineering and Management,2002,128(2):156-164.

[26]Frederick A.Entrepreneurial risk allocation in public-private infrastructure provision in

12

SouthAfrica[J].South A frican Journal of Business Management,2002,33(4):29-40.

[27]Lemos T,Eaton D,Betts M.Risk management in the Lusoponte concession-a case study of the two bridges in Lisbon,Portugal[J].International Journal of Project Management.

[28]World Development Report1994:infrastructure for development[R].World Bank.1994(06). [29]Dr

Paul

H

K

Ho.Development

of

Public

Private

Partnerships(PPPs)in

China[R].TheHongKongInstituteofSurveyors.2004.

[30]Pauline Vaillaneourt、Rosenau.Public Private Poliey Partnerships[M].Cambridge.MIT Press.2000.

[31]World Development Report 1994:infrastrueturefor.

[32]孙建平,李胜.蒙特卡洛模拟在城市基础设施项目风险评估中的应用[J].上海经济研究,2005. [33]张星,孙建平,李胜.BOT项目风险的模糊综合评价[J].上海财经研究,2004(10). [34]刘新平,王守清.论PPP项目的风险分配原则和分担框架[J].建筑经济,200(2). [35]刘子卫.工程风险及风险分担机制探讨[J].经济论坛,2007,18:59-61.

[36]宋志东.BOT融资中的风险分担及合同管理[J].吉林省经济管理干部学院学报,2004,18:28-31. [37]李秀辉,张世英.PPP:一种新型的项目融资方式[J],中国软科学,2002(2):51-54. [38]王丽娅.PPP在国外基础设施投资中的应用及对我国的启示[J].海南金融,2003(11):36-40. [39]王周喜,张勇.P即融资模式在西部基础设施建设中的可行性分析[J].西北农林科技大学报,2003,3(2):106-110.

[40]李秀辉、张世英.PPP与城市公共基础设施建设[J].城市规划,2002,26(7):74-76

[41]杨斌武,杨基成,蒋文举.试论通过即P模式处理我国城市垃圾[J].中国人口.资源与环境,2003,13(2):101-105.

[42]李晓宇,张文桂.借鉴即P模式对高校教学公共设施建设及管理的探索[J].实验技术与管理,2005,22(6):112-115.

[43]刘志强,郭彩云.基础设施建设项目引入P即融资方式探讨[J].建筑经2005(6):40-42.

[44]王颧.加快PPP模式的研究与应用,推动轨道交通市场化进程[J].宏观经济研究,2004(1):47-49. [45]刘雷.即P(公私协作)在北京轨道交通建设运营中的应用研究[博士学位论文].北京:对外经济贸易大学,2005.

[46]宋志东.BOT融资中的风险分担及合同管理[J].吉林省经济管理干部学院学报,2004,18:28-31. [47]彭桃花,赖国锦.PPP模式的风险分析与对策[J].中国工程咨询,2004,7:11-13. [48]李永强,苏振民.PPP项目风险分担的博弈分析[J].基建优化,2005,26:16-21.

13

[49]程述,谢丽芳.工程项目风险分担模型探讨[J].工程项目管理,2006,11:93-96. [50]刘江华.项目融资风险分担研究[J].工业技术经济,2006,258.

[51]刘新平、王守清.试论PPP项目的风险分配原则和框架[J].建筑经济,2006,2:59-63. [52]刘子卫.工程风险及风险分担机制探讨[J].经济论坛,2007,18:59-61.

[53]涂铭,汪霄.PPP项目风险因素和承担机制研究J].基建优化,2007,28:25-28.

百度搜索“77cn”或“免费范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,免费范文网,提供经典小说综合文库风险管理文献综述 2(3)在线全文阅读。

风险管理文献综述 2(3).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印 下载失败或者文档不完整,请联系客服人员解决!
本文链接:https://www.77cn.com.cn/wenku/zonghe/975322.html(转载请注明文章来源)
Copyright © 2008-2022 免费范文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ: 邮箱:tiandhx2@hotmail.com
苏ICP备16052595号-18
× 注册会员免费下载(下载后可以自由复制和排版)
注册会员下载
全站内容免费自由复制
注册会员下载
全站内容免费自由复制
注:下载文档有可能“只有目录或者内容不全”等情况,请下载之前注意辨别,如果您已付费且无法下载或内容有问题,请联系我们协助你处理。
微信: QQ: